The Great Southern Homes build process

From First Conversation To Handover. Eight Clear Stages, One Builder, No Surprises Along The Way.

Building a custom home from Perth in a region you do not live in is a real commitment.
This is exactly how a Great Southern Homes project runs, stage by stage, so you know what
happens, what it costs, and who is responsible at every point. Michael Smyth manages all eight stages personally.

Master Builders WA Award

Renovation and Extension $600-$750K

Master Builders Association

WA, Member 7 Years

Home Indemnity Insurance

Projects to $1.5M

Denmark, Albany

and the Great Southern Region

The process in one view

What Is The Great Southern Homes Build Process?

We run every project through eight stages, from the first conversation to handover and the review period that follows. Each stage has one job: to remove a specific risk before it becomes a problem. A typical custom build takes around 18 months from building permit approval to handover. Michael Smyth, the builder, is your single point of contact across all eight.

The eight stages, and what each one gives you:

Eight stages

From The First Conversation To Handover

Stage 1

It starts with a conversation, not a contract

The first stage is a conversation about your land, your plans or brief, and your budget. A short questionnaire beforehand lets us understand the project before we talk, so we can both judge whether it is a genuine fit.

The first stage is a discussion, not a sales process. There is no template pitch and no obligation. The goal is to work out whether the project is a genuine fit before either side commits to anything.

A short questionnaire beforehand covers what you want to build, your priorities, and whether you have land. It gives us a real feel for the project before we talk, and gives you a structured way to think through what you actually want.

If the project is not the right fit for us, we will tell you in this conversation, and point you toward a better option where we can.

Homeowners standing at the front entry of their new home in Denmark, WA
Stage 2

Design decisions get regional input before they are locked

If you are still in design, we work with your architect or designer before the plans are finalised. We flag which trades, materials and Perth-drawn specifications will not work well here, so costly changes do not surface at engineering or council review.

A design drawn without regional input can specify trades or materials that are easy to get in Perth but hard to source or schedule here. We flag that while it is still a drawing, not a problem on site.

Caught early, a buildability issue is a simple adjustment. Caught after plans are approved and engineering is underway, it becomes a redesign and a cost. Early input is what keeps that cost off your project.

We contribute the buildability layer, not the design itself. The architect owns the design. Clients who come with completed plans skip straight to costing.

Floor plans and elevation drawings with brick, cladding and stone samples on a timber table
Stage 3

The block gets assessed before the budget is built on it

Takeaway: We confirm bushfire rating and ground conditions before engineering, so the block cannot surprise your budget mid-build.

Around half of Great Southern blocks carry a Bushfire Attack Level (BAL) requirement. A BAL consultant confirms the rating and what the design must include, and a geotechnical report shows what is under the ground. Both are done before engineering, not during construction.

We engage a dedicated BAL consultant to set the rating, and that rating drives design and material decisions: glazing, cladding, screening, sealing ember gaps. Higher ratings add cost and can constrain the design, which is exactly why it is settled at the start rather than discovered at council review.

Great Southern blocks range from granite and steep slopes to clay, waterlogged ground and fill. A geotechnical report establishes what is actually under the block before engineering begins. A budget built on assumptions about the ground is not a budget, it is a starting point for disputes.

Bushfire rating and ground conditions are the two surprises that derail regional builds when they surface late. Resolving both before engineering means the design and the budget are built on what the block actually is, not on assumptions.

Consultant with a clipboard assessing a sloping bush block beside a granite outcrop
Stage 4

A detailed budget is built before any contract is signed

Takeaway: You see what everything actually costs, with a fixed building fee and no margin hidden inside a number you cannot check.

With the design and site conditions known, we prepare a detailed cost-plus budget. As many trades and materials as possible are quoted before you sign, so the budget starts from real quotes rather than estimates.

On a custom build that runs 12 to 18 months, prices on materials and trades cannot honestly be locked at the start. A fixed-price contract handles that by burying a risk margin inside a number you never see. Cost-plus does the opposite. You pay the actual cost of the work, plus a fixed building fee, and you can see every charge.

Before any contract, we get as many trades to quote as will, and price up materials wherever possible, so the budget you start with is grounded in real numbers. Some cost movement over a long build is unavoidable, things like unforeseen price increases, and we explain that openly rather than hide it. What you will not get is a margin you cannot see, padded into a fixed price to cover the builder's risk.

A budget-led brief is the one place this process can struggle. If the priority is the lowest possible fixed number, a transparent cost-plus build may not suit, and we will say so early rather than late.

Itemised trade quotes, calculator and laptop on a timber table
Stage 5

You know what you are signing, and what happens next

With the budget agreed, we prepare your building contract using Master Builders WA contracts. A pre-start meeting then covers how the build will run and any selections still to confirm. Nothing about the process should surprise you once work starts.

We prepare the building contract using contracts provided through Master Builders WA, so what you sign sits on a recognised industry standard rather than something drawn up in-house.

Where an architect has handled selections, much is settled already. Where selections are still open, the pre-start meeting is where they get resolved, so the project moves into construction with the detail done.

The pre-start meeting sets the rhythm of the build: when fortnightly updates happen, how progress claims work, and who you contact about what. For a client building from Perth, this is where the process becomes a plan with dates against it.

Tile, tapware, paint and brick samples beside a closed contract folder
Stage 6

Permits, compliance and the insurance that protects you, all in place before work starts

Takeaway: Your permits and the insurance that protects you if we cannot finish are all in place before any work starts on site.

Before construction, we secure the approvals: development application support where needed, and the building permit. WA law requires Home Indemnity Insurance on residential work over $20,000, and we have it in place before any permit is submitted.

Consultants assist with development application approvals where a project needs them, and the building permit is submitted once the design, compliance, and insurance are in order. Because BAL and ground conditions were resolved early, the permitted design is the build, not a version that has to change later.

In WA, Home Indemnity Insurance protects you if the builder becomes insolvent, dies, or cannot complete the work. If finishing the build with another builder costs more than the money left on your contract, the insurance covers that shortfall up to a defined limit. Given the builder failures reported across WA recently, it is worth understanding exactly what it covers.

We also carry public liability insurance, which indemnifies the owner against incidents arising from an active building site, and contract works insurance, which covers the building under construction and materials against events like storm or machinery damage.

Pavilion raised on timber posts and steel stirrups over a sloping bush block
Stage 7

You stay across the build from Perth, without chasing anyone

Takeaway: You stay across the build from Perth with fortnightly updates you never have to chase, and one builder accountable throughout.

Every two weeks you receive progress photos, followed by a FaceTime site walkthrough or an in-person meeting if you are nearby. Each stage is inspected against a checklist before the build moves on, and Michael is your single point of contact throughout.

You do not have to ask for updates. They are part of how every project runs. Photos arrive before each scheduled call so you can see progress and form your questions in advance. Then the call or site walkthrough covers what stage the build is at, what is coming in the next fortnight, and anything either side needs to decide. Between updates, BuilderTrend holds the project documentation so you can check in without waiting for a meeting.

Milestone and hold point inspections are built into the build schedule. At each stage, the work is inspected against a checklist before the project moves on, so a stage only progresses once it meets standard. If something is not right, it is corrected before the next stage starts, which is what stops small issues becoming expensive backtracking later.

Michael runs the build on site and is the person you deal with throughout. There is no project manager you have never met sitting between you and the build. If something needs a decision or an explanation, it comes from the person responsible for the work.

Timber wall frame standing on a concrete slab on a rural block
Stage 8

The relationship does not end at the keys

We hand over the keys on site, and a four-month review period begins. You live in the home and list anything that needs attention. We then fix it in one return visit, and urgent electrical or plumbing issues are handled straight away.

The four-month review period exists because some faults only show themselves with use. Rather than calling about each item as it appears, you note them as you go, and we work through the whole list together in one visit.

A genuine electrical or plumbing defect is not something you wait on. Those are dealt with immediately. The running list is for the minor, settling-in items that can sensibly be handled in one return visit.

The six-year statutory structural warranty applies to every residential build in Western Australia by law. Non-structural items are covered as outlined in the building contract.

Michael Smyth walking homeowners through the garden of their new home in Denmark, WA
Why the process is built this way

Every Stage Exists To Remove A Specific Risk

The eight stages are not a formality. Each one is built to remove a specific risk that a custom build in this region carries: a price that drifts, a site that surprises you mid-build, a design that has to be reworked, a build you cannot see from Perth, and the chance of a builder who cannot finish. Handled in the right order, by one accountable builder, these stop being the things that go wrong.

Building in the Great Southern is not the wrong decision. Choosing a builder who treats the process as optional is. The transparency at the budget stage, the BAL and ground work done before engineering, the insurance in place before the permit, and the fortnightly visibility during the build are all there for the same reason: so the build behaves the way it was planned to.

Original black cottage beside its award-winning pavilion extension in Denmark, WA

Delivered An Exceptional Result

Mike and Great Southern Homes delivered an exceptional result on a complex build on a unique site. From the outset, Mike's communication was clear, and he set accurate expectations around the process. He never over-promised, which meant the project progressed smoothly and without any major surprises

Waldemar Kolbusz

Questions about how the process works

Common questions about the Great Southern Homes build process

How long does the whole process take?
From building permit approval to handover, a typical custom build takes around 18 months. The stages before that, design, site assessment, costing and approvals, vary by project and by how far along you are when you start. Some projects sit in design for six months or more, others move to site within a couple of months of the first conversation. The timeline is discussed honestly at the budget stage rather than promised upfront.
What happens if my block needs bushfire (BAL) compliance?

Around half of Great Southern projects carry some level of BAL requirement. A dedicated BAL consultant assesses the site at Stage 3, before the design is finalised, confirms the rating, and sets out what the design and materials must include. It is built into the permitted design from the start, which is what prevents the costly material substitutions and redesigns that happen when BAL is discovered late.

How do I stay in control of the build if I am in Perth?

Progress is communicated every two weeks, with photos sent before each scheduled FaceTime walkthrough or in-person meeting, and BuilderTrend used for documentation between updates. You do not have to chase anyone, the updates are built into the project. Michael, your builder, is the single point of contact throughout, so any decision or explanation comes directly from the person running your build.

Why cost-plus instead of a fixed price?

On a build that runs 12 to 18 months, material and trade prices cannot honestly be locked at the start. A fixed price handles that by hiding a risk margin inside a number you never see. Cost-plus bills you for the actual cost of materials and labour plus a fixed building fee, with as many costs as possible quoted before the contract. You see what everything actually costs, with no hidden margin.

What protects me if the builder cannot finish the job?

In Western Australia, Home Indemnity Insurance is legally required on residential work over $20,000, and a council will not issue a building permit without it. It covers you if the builder becomes insolvent, dies, or cannot complete the work, paying the shortfall to engage another builder up to a defined limit. Great Southern Homes holds this insurance before any building permit is submitted.

The Great Southern Build Conversation

The Wrong Builder Costs More Than Money

You have seen how this process is meant to run. Start with a conversation about your land and what you want to build, and find out whether Great Southern Homes is the right fit, before you commit to anyone.